Site visits | 423 |
Sites | 0 |
Records | 0 |
Site code | Site description | Sampling date | Owner | Total occurrences | Actions |
---|---|---|---|---|---|
H1MOLE-00036 Validated |
2.24 km from confluence of Molenaars and Elands Rivers. Control site upstream of second bridge, but existing impacts are farming and a trout hatchery.
|
1992-05-01 | Geordie Ractliffe | 21 | |
H1MOLE-00025 Validated |
0.23 km from confluence of Molenaars and Elands Rivers. Control site upstream of first bridge, potentially affected by trout farm effluent in upper catchment, although these are located > 5 km upstream.
|
1992-04-01 | Geordie Ractliffe | 55 | |
H1MOLE-00037 Validated |
2.04 km from confluence of Molenaars and Elands Rivers. Impact site downstream of bridge construction, also impacted by small-scale fruit orchard cultivation.
|
1992-04-01 | Geordie Ractliffe | 52 | |
H1MOLE-00036 Validated |
2.24 km from confluence of Molenaars and Elands Rivers. Control site upstream of second bridge, but existing impacts are farming and a trout hatchery.
|
1992-04-01 | Geordie Ractliffe | 52 | |
H1MOLE-00033 Validated |
2.94 km from confluence of Molenaars and Elands Rivers. Impact site immediately downstream of second bridge.
|
1992-04-01 | Geordie Ractliffe | 49 | |
H1MOLE-00031 Validated |
3.58 23 km from confluence of Molenaars and Elands Rivers. Additional impact site subject to existing impacts in the form of sediment loads from an eroding head cut on the slopes of the valley sides.
|
1992-04-01 | Geordie Ractliffe | 40 | |
H1MOLE-00026 Validated |
4.45 km from confluence of Molenaars and Elands Rivers. Additional impact site, also impacted by trout farm and hotel.
|
1992-04-01 | Geordie Ractliffe | 46 | |
H1MOLE-00032 Validated |
8.47 km from confluence of Molenaars and Elands Rivers. Unimpacted control site 4 km downstream of all anthropogenic activity.
|
1992-04-01 | Geordie Ractliffe | 48 | |
H1MOLE-00038 Validated |
13.41 km from confluence of Molenaars and Elands Rivers. Additional unimpacted control site at the end of the valley.
|
1992-04-01 | Geordie Ractliffe | 46 | |
H1MOLE-00025 Validated |
0.23 km from confluence of Molenaars and Elands Rivers. Control site upstream of first bridge, potentially affected by trout farm effluent in upper catchment, although these are located > 5 km upstream.
|
1992-02-01 | Geordie Ractliffe | 24 | |
H1MOLE-00037 Validated |
2.04 km from confluence of Molenaars and Elands Rivers. Impact site downstream of bridge construction, also impacted by small-scale fruit orchard cultivation.
|
1992-02-01 | Geordie Ractliffe | 26 | |
H1MOLE-00036 Validated |
2.24 km from confluence of Molenaars and Elands Rivers. Control site upstream of second bridge, but existing impacts are farming and a trout hatchery.
|
1992-02-01 | Geordie Ractliffe | 26 | |
H1MOLE-00033 Validated |
2.94 km from confluence of Molenaars and Elands Rivers. Impact site immediately downstream of second bridge.
|
1992-02-01 | Geordie Ractliffe | 26 | |
H1MOLE-00031 Validated |
3.58 23 km from confluence of Molenaars and Elands Rivers. Additional impact site subject to existing impacts in the form of sediment loads from an eroding head cut on the slopes of the valley sides.
|
1992-02-01 | Geordie Ractliffe | 26 | |
H1MOLE-00032 Validated |
8.47 km from confluence of Molenaars and Elands Rivers. Unimpacted control site 4 km downstream of all anthropogenic activity.
|
1992-02-01 | Geordie Ractliffe | 27 | |
H1MOLE-00038 Validated |
13.41 km from confluence of Molenaars and Elands Rivers. Additional unimpacted control site at the end of the valley.
|
1992-02-01 | Geordie Ractliffe | 29 | |
H1MOLE-00026 Validated |
4.45 km from confluence of Molenaars and Elands Rivers. Additional impact site, also impacted by trout farm and hotel.
|
1992-02-01 | Geordie Ractliffe | 23 | |
H1MOLE-00025 Validated |
0.23 km from confluence of Molenaars and Elands Rivers. Control site upstream of first bridge, potentially affected by trout farm effluent in upper catchment, although these are located > 5 km upstream.
|
1992-01-01 | Geordie Ractliffe | 27 | |
H1MOLE-00037 Validated |
2.04 km from confluence of Molenaars and Elands Rivers. Impact site downstream of bridge construction, also impacted by small-scale fruit orchard cultivation.
|
1992-01-01 | Geordie Ractliffe | 25 | |
H1MOLE-00036 Validated |
2.24 km from confluence of Molenaars and Elands Rivers. Control site upstream of second bridge, but existing impacts are farming and a trout hatchery.
|
1992-01-01 | Geordie Ractliffe | 27 |