Site visits | 41,821 |
Sites | 0 |
Records | 0 |
Site code | Site description | Sampling date | Owner | Total occurrences | Actions |
---|---|---|---|---|---|
H7BUFF-RIETV Validated |
On Rietvallei property, Riverside cottage turn off. Downstream of Suurbraak town and downstream of low flow bridge/ causway. In riffle area between two pools.
|
2024-04-24 | Aileen Anderson | 2 | |
H7TRAD-DSSTO SASS Validated |
Lower Tradouw site Barrydale Redfin biodiversity management plan monitoring. SASS site slightly upstream of fish monitoring site. Tradouw pass, just downstream of Stonehaven, downslope of aftrek plek.
|
2024-04-26 | Aileen Anderson | 14 | |
G5NUWE-00563 In Review |
0c9112bd-2aca-445e-9fff-f38fbfceadff
|
2024-04-26 | Anja Vos | 2 | |
G5NUWE-00566 In Review |
201242f4-2161-42b9-b527-41fc4023a090
|
2024-04-26 | Anja Vos | 2 | |
G5NUWE-00567 In Review |
f5651cbe-a39c-4a9d-9d4a-23b9321b6f71
|
2024-04-26 | Anja Vos | 2 | |
H7TRAD-HOEKR SASS Validated |
Site just upstream of last fields on the Lismore farm (approach from right bank of river). About 1km Upstream of the confluence with the Grootvadersbosch river.
|
2024-04-29 | Aileen Anderson | 19 | |
G3ROOI-00013 Validated |
The Jacuzzi
|
2024-04-30 | Jeremy Shelton | 2 | |
H7GROO-GLENE SASS Validated |
Just downstream of the Grootvadersbosch farm boundary, on Glen Etive farm. Upstream of river crossing. Private property. Contact Grootvadersbosch Conservancy for acces queries.
|
2024-04-30 | Aileen Anderson | 17 | |
G5KLIP-00197 In Review |
448c1c74-6823-4e1f-aa25-640599a09b09
|
2024-04-30 | Anja Vos | 1 | |
G5KLIP-00198 In Review |
1cbf7561-3f7a-4613-9c5c-f2ace818cb45
|
2024-04-30 | Anja Vos | 1 | |
G5KLIP-00199 In Review |
9a7eec8b-17c0-4ae0-85a2-957964124363
|
2024-04-30 | Anja Vos | 1 | |
H7GROO-THEOK SASS Validated |
Site is just after River Crossing at low water bridge. First net attempt (2021) was 200m slightly down stream at farm entrance crossing. Combined sites as very close together.
|
2024-05-01 | Aileen Anderson | 17 | |
H7GROO-THEOK Validated |
Site is just after River Crossing at low water bridge. First net attempt (2021) was 200m slightly down stream at farm entrance crossing. Combined sites as very close together.
|
2024-05-02 | Aileen Anderson | 2 | |
G5UINT-00086 In Review |
6c4945c7-3852-4267-b533-7c43a4025b66
|
2024-05-02 | Anja Vos | 1 | |
G2LOUR-VERGL SASS Validated |
d/s of wooden pedestrian bridge & opposite farm buildings, Vergeleden estate
|
2024-05-06 | Bentley Engelbrecht | 13 | |
G2SIRL-WEDDE SASS Validated |
At woodenbridge in Wedderwill Estate
|
2024-05-06 | Bentley Engelbrecht | 12 | |
H6RIVI-00142 SASS Validated |
Sonderend
|
2024-05-06 | Jeanne Gouws | 18 | |
H6ELAN-DSWWT SASS Validated |
Elands River just downstream of where canal from Villiersdorp waste water treatment works enters the river, on farm property.
|
2024-05-06 | Jeanne Gouws | 14 | |
H6DUTO-00110 SASS Validated |
Du Toits
|
2024-05-06 | Jeanne Gouws | 14 | |
H7KORI-GAIUP SASS Validated |
upstream of Gaiko lodge. Activities around such as making firewood.
|
2024-05-07 | Aileen Anderson | 22 |